We perform Pre-Feasibility study, Feasibility study, Detailed design, and Construction Supervision for Heap Leach Facility.
Between 2006 and 2008 we have done Detailed Environmental Impact Study of Heap Leach Facility of Boroo Gold Co., Ltd (BGC) in collaboration with JEMR environmental consulting company.
Inspection of clay liner of heap leach pad of BGC was done between 2007 and 2008 by our company.
Projects are:
• Heap leach facility of Boroo Gold Co., Ltd.
• Pre-feasibility study heap leach facility of Khurentolgoi deposit in Umnugobi province